The Seven Unloading Steps for a Slitting Machine

Apr 11, 2026 Leave a message

The material unloading procedure for the slitting machine has been clearly and comprehensively divided into seven steps to standardize slitting operations and prevent hazards and operational errors.

 

1. First, position the shaft-extraction trolley directly beneath the center of the gantry crane to facilitate the lifting of materials.


2. The Main Operator raises the upper and lower support hooks, disengages the winding cone heads, then lowers the support hooks and uses the feeding mechanism to eject the winding shafts from the machine.


3. The Assistant secures foam pads against the end faces of the material rolls to prevent soiling, scratching, or other damage. The Secondary Operator operates the auxiliary hoist, working with the Assistant to lift the upper and lower material rolls and place them securely onto the shaft-extraction trolley.


4. Once the material rolls have been unloaded, the Assistant assists the Secondary Operator in lifting the upper and lower winding shafts-now fitted with new cores-back into the feeding mechanism to be clamped; the strip is then threaded through to resume machine operation.


5. Move the shaft-extraction trolley to the clamping station, engage the clamping mechanism, and extract the shafts.


6. Once the material rolls have been fitted with inner tubes, the Secondary Operator and Assistant work together to load them into the storage rack, after which the foam pads at both ends are removed.


7. The Secondary Operator installs the new cores onto the winding shafts, while the Assistant cleans and tidies the work area.